A bathroom renovation is the most complex domestic trade project most homeowners will ever take on. Get the plumbing sequence right and everything flows. Get it wrong and you’re re-tiling over failed waterproofing, re-cutting floors for badly positioned waste pipes, or chasing leaks in a brand-new bathroom.
Here’s the checklist to work through before demolition starts on your bathroom renovation.
Before you buy anything
Before demolition
During rough-in
The waterproofing stage
Waterproofing isn’t plumbing work — it’s done by the tiler or a waterproofing specialist. It’s also the single most important step for preventing leaks. In Australia it must be applied to all wet areas and comply with AS 3740.
Make sure your plumber and waterproofer talk to each other about pipe penetrations. Every pipe coming through a floor or wall has to be sealed as part of the waterproofing application.
After tiling: the fit-off checklist
FAQs about bathroom renovation plumbing
How much of a bathroom renovation does a plumber do?
Your plumber handles all rough-in and fit-off work — everything to do with water supply, waste pipes and fixture connections. The tiler handles waterproofing and tiling, and a builder or carpenter handles structural changes. Getting those trades in the right sequence is what makes a renovation run smoothly.
Can I use the bathroom while the renovation is in progress?
Usually not. Once demolition starts the bathroom is out of service until fit-off is finished. In a single-bathroom household, the two to four week timeline is worth planning around.
Do I need council approval for a bathroom renovation?
Cosmetic renovations — new fixtures in the same positions, same waterproofing envelope — usually don’t need council approval in most Australian states. Structural changes, or adding a bathroom, may require a development application. Check with your council.